The existing plant is a Class 1 trickling sand filter with UV disinfection that treats approximately 28 homes. A new upgrade at the current location will expand the treatment capability to 40 equivalent homes with allowance for a further 40 homes. The replacement facility is under construction on site and will be a Waterloo biofilter plant similar to Mill Cove.